WEBVTT 00:00.000 --> 00:01.652 - Well, this morning we came in 00:01.652 --> 00:04.277 and we removed all the damaged asphalt, 00:04.277 --> 00:08.149 exposed the utilities, that was under the road, 00:08.149 --> 00:10.144 make sure that nothing was damaged. 00:10.144 --> 00:12.441 FMD is working on a alternate path south of 00:12.441 --> 00:16.483 the Cranes Road and they are mobilizing today 00:16.483 --> 00:18.870 to set up temporary path. 00:18.870 --> 00:20.898 Right now, we're waiting on the material, 00:20.898 --> 00:22.800 crushed rock to come out here, we'll back-fill it, 00:22.800 --> 00:24.201 steel plates will be here this afternoon. 00:24.201 --> 00:25.646 We'll get everything rounded up. 00:25.646 --> 00:27.535 The estimated time to have the road re-opened 00:27.535 --> 00:29.344 will be sometime Friday. 00:29.344 --> 00:31.898 - So for the sinkhole, what we're doing is 00:31.898 --> 00:33.304 we're putting in fill right now, 00:33.304 --> 00:35.743 we're gonna put some metal plates over top of them 00:35.743 --> 00:38.146 to allow single vehicles to pass, 00:38.146 --> 00:42.352 two lanes of vehicles with POV's on the left hand side. 00:42.352 --> 00:44.708 After that, we're gonna have to deconstruct the bridge, 00:44.708 --> 00:47.136 and then we're gonna start repairs on the outfall side 00:47.136 --> 00:48.238 of the culvert. 00:48.238 --> 00:49.944 That's gonna get us re-opened and our goal's to be 00:49.944 --> 00:51.750 re-opened by COB Friday. 00:51.750 --> 00:53.767 Have vehicle access cross this way. 00:53.767 --> 00:55.139 We have a lot of vehicles. 00:55.139 --> 00:57.132 We have heavy equipment that are out here. 00:57.132 --> 00:58.953 We have PMO out here. 00:58.953 --> 01:00.923 They are remaining vigilant to try to make sure that 01:00.923 --> 01:02.305 people are staying safe. 01:02.305 --> 01:03.794 If there is anything that we can say that's 01:03.794 --> 01:05.456 gonna help us do our job and get this 01:05.456 --> 01:08.603 accomplished safely, is just please comply with 01:08.603 --> 01:10.698 whatever they ask you to do, as far as 01:10.698 --> 01:12.655 taking a specific route, 01:12.655 --> 01:14.925 and that's going to make sure that construction 01:14.925 --> 01:16.847 operations are going to be able to continue quickly 01:16.847 --> 01:18.844 and we can get the equipment that we need 01:18.844 --> 01:20.165 to get in and out of here in order to 01:20.165 --> 01:22.248 get this place re-opened.