GLOBAL COMBAT SUPPORT SYSTEM-MARINE CORPS (GCSS-MC) INCREMENT 1 CAPABILITY RELEASE 1 (RELEASE 1.1) ANNOUNCEMENT OF III MEF FULL OPERATIONAL CAPABILITY (FOC) AND INITIATION OF LEGACY SYSTEM SUNSET
Date Signed: 9/1/2011 | MARADMINS Number: 503/11
MARADMINS : 503/11
R 011745Z SEP 11
UNCLASSIFIED//
MARADMIN 503/11
MSGID/GENADMIN,USMTF,2007/WASHINGTON DC L//
SUBJ/GLOBAL COMBAT SUPPORT SYSTEM-MARINE CORPS (GCSS-MC) INCREMENT 1 CAPABILITY RELEASE 1 (RELEASE 1.1) ANNOUNCEMENT OF III MEF FULL OPERATIONAL CAPABILITY (FOC) AND INITIATION OF LEGACY SYSTEM SUNSET//
REF/A/MSGID:DOC/-/YMD:20100128//
REF/B/MSGID:MSG/CG III MEF G-4/YMD:20100625//
NARR/REF A IS THE GLOBAL COMBAT SUPPORT SYSTEM-MARINE CORPS (GCSS-MC) CAPABILITIES PRODUCTION DOCUMENT (CPD) FOR INCREMENT 1 VERSION: 3.2, OF 7 DEC 2009 WHICH IDENTIFIED THE SYSTEM AS THE FOUNDATIONAL ENTERPRISE RESOURCE PLANNING (ERP) TOOL OF THE LOGISTICS INFORMATION TECHNOLOGY (LOG IT) PORTFOLIO. REF B IS THE III MEF WARNING ORDER AND III MEF GCSS-MC IMPLEMENTATION SCHEDULE MESSAGE.//
POC/FLAHERTY, GREGORY/LTCOL/UNIT:IL, LPV 2/NAME:PENTAGON/TEL:571 256 7194/TEL:IL, LPV 2/EMAIL:GREGORY.FLAHERTY@USMC.MIL//
POC/PEREZ, SAMUEL/CIV/UNIT:IL, LPV 2/NAME:PENTAGON/TEL:571 256 7194 /TEL:IL, LPC 2/EMAIL:SAMUEL.PEREZ1@USMC.MIL//
POC/MCSORLEY, WILLIAM/LTCOL/UNIT:IL, LPV 2/NAME:PENTAGON/TEL:703 441 4093/EMAIL:WILLIAM.MCSORLEY@USMC.MIL//
POC/LICK, DAVID/CIV/UNIT:IL, LVP 2/NAME:PENTAGON/TEL:571 256 7201 /EMAIL:DAVID.LICK@USMC.MIL//
GENTEXT/REMARKS/1. SITUATION. I AM PLEASED TO ANNOUNCE THAT THE INFORMATION TECHNOLOGY (IT) ENABLER OF OUR LOGMOD CAMPAIGN, GCSS-MC, IS AN OPERATIONAL REALITY AT III MEF. FULL OPERATIONAL CAPABILITY (FOC) FOR BLOCK 1, RELEASE 1.1 WAS ATTAINED ON 3 JUN 2011.  THE ATTAINMENT OF THIS IMPORTANT PROGRAM MILESTONE BENEFITS THE WARFIGHTER AND IS THE CORNERSTONE OF OUR LOGMOD INITIATIVE.  IN CONJUNCTION WITH THIS ACCOMPLISHMENT, THIS MESSAGE IS THE FIRST IN A SERIES DELINEATING THE COORDINATION REQUIRED FOR THE SUNSET/RETIREMENT OF LEGACY LOG IT SYSTEMS AS WE INCREMENTALLY EXECUTE MARINE CORPS-WIDE IMPLEMENTATION. SPECIFICALLY, FOR THE III MEF AOR, THIS ENTAILS THE RETIREMENT OF SASSY, MIMMS, PC MIMMS, AND ATLASS. ULTIMATELY, EFFICIENCIES GAINED BY THE FULL DEPLOYMENT OF GCSS-MC BLOCK 1 AND THE RETIREMENT OF LEGACY SYSTEMS WILL ALLOW DC IL THE OPPORTUNITY TO ADVOCATE FOR THE REINVESTMENT OF RESOURCES WITHIN THE LOGISTICS IT PORTFOLIO.
2.  MISSION. NLT 30 SEP 2011 III MEF, IN COORDINATION WITH IL (CODE: LPC), PROGRAM MANAGER (PM) LOGISTICS INFORMATION SYSTEMS (LIS), AND MCLC, WILL CLOSE OUT ATLASS/SASSY/MIMMS/PC MIMMS LEGACY AIS AND LATENT SUPPLY MANAGEMENT TRANSACTIONS.
3.  EXECUTION.
3.A. COMMANDERS INTENT. AS CONDITIONS FOR TOTAL FORCE IMPLEMENTATION (TFI) ARE SATISFIED AND THE FULL BENEFITS OF GCSS-MC ARE REALIZED, DC IL WILL DIRECT THE DELIBERATE AND SYSTEMATIC RETIREMENT OF LEGACY SYSTEMS. ATTAINMENT OF THIS IMPORTANT OBJECTIVE WILL POSTURE DC IL TO LEVERAGE SYSTEM EFFICIENCY GAINS AS SAVINGS FOR REINVESTMENT OF RESOURCES ACROSS THE LOGISTICS IT PORTFOLIO. THE SUNSET/RETIREMENT OF ATLASS/SASSY/MIMMS/PC MIMMS IN THE III MEF AOR IS THE FIRST STEP IN ACHIEVING THIS OBJECTIVE.
3.B. CONCEPT OF OPERATIONS. THE SEQUENCING FOR THE SUNSET/RETIREMENT OF LEGACY IT SYSTEMS WILL BE CONDUCTED IN THREE PHASES. THE FIRST PHASE WILL OCCUR AT III MEF NLT 30 SEP 2011 AS A RESULT OF ITS ATTAINMENT OF GCSS-MC BLOCK 1, RELEASE 1.1 FOC. FOR SUBSEQUENT PHASES, HQMC LP WILL DIRECT AND FINALIZE THE SUNSET/RETIREMENT OF LEGACY SYSTEMS UPON THE ATTAINMENT OF A FULL DEPLOYMENT DECISION (FDD) FOR TFI DURING 3RD QTR, FY12 AND UPON THE DECLARATION OF GCSS-MC BLOCK 1 FULL DEPLOYMENT (FD) DURING 2ND QTR, FY13 FOR THE SECOND AND THIRD PHASES, RESPECTIVELY, AS DETERMINED BY THE MILESTONE DECISION AUTHORITY (MDA).
3.C. TASKS
3.C.1. DC IL.
3.C.1.1. LOGISITICS POLICY AND CAPABILITIES BRANCH (CODE LPC) ASSUME LEAD FOR CONFIGURATION CONTROL, POLICY COMPLIANCE, AND FUNCTIONAL ADVOCACY FOR GCSS-MC R1.1.
3.C.1.2. NLT 16 AUG 2011, PUBLISH THE COORDINATED POAM IAW THE GCSS-MC BLOCK 1 PROGRAM SCHEDULE FOR TRANSITION OF REMAINING LEGACY AIS DEVELOPED BY MCLC AND PM GCSS-MC.
3.C.1.3. NLT 31 AUG 2011, PUBLISH THE CHANGE CONTROL BOARD (CCB) CHARTER DEVELOPED BY HQMC LPC AND PM GCSS-MC.
3.C.1.4. IAW THE FY12 FSMAO SCHEDULE, CONDUCT COMPLIANCE ASSESSMENTS WITHIN III MEF.
3.C.2. CG, III MEF (G4).  ENSURE UNITS IDENTIFIED FOR CUTOVER AND POSSESSING LATENT LEGACY AIS TRANSACTIONS COORDINATE WITH PM LIS, GCSS-MC, AND MARINE CORPS LOGISTICS COMMAND (RETAIL SYSTEMS BRANCH) TO TRANSFER ACTIVE RECORDS TO GCSS-MC ACCOUNTS.
3.C.3. CG, MCLC. COORDINATE WITH AND SUPPORT PMO GCSS-MC IN THE DEVELOPMENT OF THE SUNSET/RETIREMENT POAM OF LEGACY AIS IDENTIFIED IN PARA. 3.C.1.2.
3.C.4. PMO, GCSS-MC.  COORDINATE WITH DC IL AND MCLC TO DEVELOP A PLAN OF ACTION AND MILESTONES (POAM) FOR TRANSITION OF ANY REMAINING LEGACY SASSY AND MIMMS AIS REQUIRED TO SUPPORT SUNSET/RETIREMENT IDENTIFIED IN PARA. 3.C.1.2.
3.D. COORDINATING INSTRUCTIONS.  NOT APPLICABLE.
4.  ADMIN AND LOGISTICS.  SUBSEQUENT MESSAGE RELEASES IN THIS SERIES WILL BE EXECUTED IN 3RD QTR, FY12 FOR FDD AND 2ND QTR, FY13 FOR FD AS TFI CONDITIONS ARE SATISFIED IAW THE GCSS-MC BLOCK 1 PROGRAM SCHEDULE.
5.  COMMAND AND CONTROL.  III MEF HAS DIRLAUTH WITH IL, PM LOGISTICS INFORMATION SYSTEMS (LIS), AND MCLC IN THE EXECUTION OF THIS GUIDANCE.
6.  RELEASE AUTHORIZED BY LTGEN F. PANTER, DEPUTY COMMANDANT FOR INSTALLATIONS AND LOGISTICS.//