USMC EXPEDITIONARY ENERGY WATER AND WASTE (E2W2) GAP AND RISK ASSESSMENT INTEGRATED PROCESS TEAM (IPT) WORKSHOP
Date Signed: 8/2/2010 | MARADMINS Number: 429/10
MARADMINS : 429/10

R 302200Z JUL 10
UNCLASSIFIED//
MARADMIN 429/10
MSGID/GENADMIN/CMC WASHINGTON DC DMCS //
SUBJ/USMC EXPEDITIONARY ENERGY WATER AND WASTE (E2W2) GAP AND RISK ASSESSMENT INTEGRATED PROCESS TEAM (IPT) WORKSHOP//
POC/M. SCOTT/CIV/UNIT:E2O/-/EMAIL:MYRA.SCOTT(AT)USMC.MIL/TEL:703-614-4230/TEL:DSN 224-4230//
GENTEXT/REMARKS/1.  THE EXPEDITIONARY ENERGY OFFICE (E20) WILL HOST THE EXPEDITIONARY ENERGY WATER AND WASTE (E2W2) GAP AND RISK ASSESSMENT INTEGRATED PROCESS TEAM (IPT) WORKSHOP 30 AUG - 1 SEP 2010 AT THE WHITNEY, BRADLEY AND BROWN (WBB) FACILITIES IN RESTON, VA.  THE WORKSHOP WILL CONVENE FROM 0800-1700 FOR THREE DAYS. REQUEST THE COMMANDS AND ORGANIZATIONS NOTED BELOW SEND SUBJECT MATTER EXPERTS THAT WILL INFLUENCE CAPABILITY DECISIONS THAT WILL CHANGE THE WAY WE EMPLOY ENERGY AND RESOURCES TO INCREASE OUR COMBAT EFFECTIVENESS.
HQMC MRA (MANPOWER, MCCS)
HQMC AVIATION HQMC PPO (FIRES, MANEUVER, FORCE PROTECTION)
HQMC IL (LB, LP, LFF, LFL)
HQMC PR (PAE)
HQMC C4 (COMMUNICATIONS AND IM)
HQMC INTEL (INTELLIGENCE)
MCCDC (DOCTRINE, CDD, TECOM, MCWL, LID)
MARFORPAC
MARFORCOM
MARCENT
MARFORRES
MARFOREUR
MARFORAF
MARFORSOUTH
MARSOC
I MEF
II MEF
III MEF
MCI-EAST
MCI-WEST
MARINE CORPS LOGISTICS COMMAND
MARINE CORPS SYSTEMS COMMAND
2.  THIS IPT WILL CONDUCT THE SECOND OF THREE FACILITATED WORKSHOPS FOR THE DEVELOPMENT OF A JOINT CAPABILITIES INTEGRATION AND DEVELOPMENT SYSTEM (JCIDS) CAPABILITIES BASED ASSESSMENT (CBA) ON USMC E2W2.  THE CBA WILL PROVIDE THE ANALYSIS NEEDED TO SUPPORT THE DEVELOPMENT OF A USMC E2W2 INITIAL CAPABILITIES DOCUMENT (ICD).  THE E2W2 CBA WILL LEVERAGE EXISTING ANALYSIS, STUDIES, AND ICD WORK DONE ON ENERGY REQUIREMENTS FOR THE MARINE CORPS AND WILL USE THE EXPEDITIONARY ENERGY CONCEPT OF OPERATIONS (CONOPS) CURRENTLY UNDER DEVELOPMENT BY MARINE CORPS COMBAT DEVELOPMENT COMMAND (MCCDC) AS THE OPERATIONAL FOUNDATION.  THE E2W2 CBA WILL ESTABLISH THE ANALYTICAL BASELINE NECESSARY TO ARTICULATE FUTURE REQUIREMENTS FOR EXPEDITIONARY ENERGY.
3.  DURING THE WORKSHOP, PARTICIPANTS WILL REVIEW E2W2 TASK LIST AND REVISED CONOPS.  PARTICIPANTS WILL THEN PRIORITIZE MARINE CORPS REQUIREMENTS THAT ADEQUATELY DEFINE AND SUPPORT BOTH SERVICE AND JOINT OPERATIONS ENERGY CAPABILITY REQUIREMENTS.  USING THE REVISED PRIORITIZED TASK LIST, THE PARTICIPANTS WILL THEN CONDUCT A GAP AND RISK ASSESSMENT USING THE REVISED CONOPS AND EXPEDITIONARY ENERGY STRATEGY AS THE FOUNDATION FOR DETERMINING THE LEVEL AT WHICH EXISTING E2W2 CAPABILITY MEETS MISSION REQUIREMENTS AND TARGETED EFFICIENCY AND EFFECTIVENESS METRICS.  PARTICIPANTS WILL VALIDATE ALL RESULTS FROM THIS ASSESSMENT.
4.  COMMANDS WILL FUND THEIR REPRESENTATIVES AND ISSUE NON-REPORTING TEMPORARY ADDITIONAL DUTY ORDERS.  UNIFORM IS APPROPRIATE CIVILIAN ATTIRE.  LOCATION OF THE WORKSHOP IS THE WBB FACILITIES: 11790 SUNRISE VALLEY DRIVE, RESTON, VA 20191.  CLOSEST COMMERCIAL ACCOMMODATIONS ARE THE RESTON SHERATON OR THE WESTIN HOTELS, BOTH WITHIN WALKING DISTANCE.  CLOSEST COMMERCIAL AIRPORT IS DULLES INTERNATIONAL AIRPORT (3 MILES), OR REAGAN NATIONAL AIRPORT (20 MILES).
5.  PLEASE CONFIRM YOUR REPRESENTATIVE FOR THE SUMMIT NLT 20 AUG 2010 TO MYRA.SCOTT(AT)USMC.MIL, OR NWEBSTER(AT)WBBINC.COM.  MR. WEBSTER CAN ALSO BE CONTACTED AT 703-448-6081 EXT 301.  WORKING AGENDAS AND BACKGROUND WILL BE SENT VIA EMAIL TO CONFIRMED PARTICIPANTS.
6.  RELEASE AUTHORIZED BY LTGEN W. J. WILLIAMS, DIRECTOR, MARINE CORPS STAFF.//