MARADMINS : 198/03
            
 R 281030Z APR 03 ZYB 
 FM CMC WASHINGTON DC(uc) 
 TO AL MARADMIN(uc) 
 MARADMIN 
 BT 
 UNCLASSIFIED 
 MARADMIN 198/03 
 MSGID/GENADMIN/CMC WASHINGTON DC//MCCDC// 
 SUBJ/GROUND RANGE SUSTAINMENT PROGRAM// 
 POC/MR RICHARD ENGELEN/GS/RANGE AND TRAINING DIV/LOC:QUANTICO 
 /TEL: DSN 278-3713/EMAIL: ENGELENRL@TECOM.USMC.MIL// 
 RMKS/1. PURPOSE. THE RANGE AND TRAINING AREA MANAGEMENT DIVISION 
 OF TRAINING AND EDUCATION COMMAND HAS PARTNERED WITH THE PROGRAM 
 MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND (PM 
 TRASYS) AND THE NAVAL SURFACE WARFARE CENTER, CORONA DIVISION (NSWC 
 CORONA) TO ESTABLISH A GROUND RANGE SUSTAINMENT PROGRAM (GRSP). THE 
 PURPOSE OF THIS DOCUMENT IS TO PROVIDE THE BASICS OF THE PROGRAM SO 
 THAT POTENTIAL PROJECTS CAN BE IDENTIFIED AND SUBMITTED FOR 
 CONSIDERATION TO TAKE ADVANTAGE OF THIS YEAR'S FUNDING. 
 2. BACKGROUND. THE NAVY SYSTEMS REPLACEMENT AND MODERNIZATION 
 (SRAM) PROGRAM, ADMINISTERED BY NSWC CORONA, HAS HISTORICALLY 
 PROVIDED FUNDING FOR QUALIFIED PROJECTS RELATED TO AVIATION TRAINING 
 RANGES. THE GRSP IS INTENDED TO COMPLEMENT THE SRAM PROGRAM BY  
 MEETING RANGE REQUIREMENTS THAT DO NOT NECESSARILY HAVE A LINK TO  
 AVIATION. THIS PROGRAM WILL GATHER POTENTIAL PROJECTS FOR GRSP  
 FUNDING, COMPLETE BASIC ENGINEERING/COSTING DATA FOR PROJECTS,  
 PRIORITIZE THE PROJECTS TO BE FUNDED, AND FUND THE APPROVED  
 PROJECTS ACCORDING TO THE PRIORITIZATION AND LIMITS OF THE GRSP  
 BUDGET. 
 3. STRATEGY. THE FUTURE INVESTMENT STRATEGY FOR RANGES AND 
 TRAINING AREAS WILL HAVE THREE MAIN PILLARS; SUSTAINMENT, UPGRADE 
 AND MODERNIZATION/TRANSFORMATION. THESE ARE DISCUSSED BRIEFLY BELOW:  
 A. SUSTAINMENT. REFERS TO ACCOMPLISHING TODAY'S TRAINING 
 TODAY USING IMPROVEMENTS OR REPLACEMENT OF EXISTING TRAINING  
 DEVICES SUCH AS LIFTERS, WORN TARGETS, AND RANGE CONTROL COMPUTERS  
 THAT CANNOT BE ACCOMPLISHED WITHIN EXISTING OPERATING AND  
 MAINTENANCE (O&M) BUDGETS. MAINTENANCE OF "STATE OF THE ART" RANGE  
 CONTROL SYSTEMS ALSO SUPPORTS CURRENT TRAINING REQUIREMENTS. THIS  
 IS THE AREA WHERE GRSP WILL BE MOST USED.  
 B. UPGRADE. REFERS TO PERFORMING TODAY'S TRAINING BETTER 
 TOMORROW AND IS ACCOMPLISHED BY PURCHASING IMPROVEMENTS IN TARGETRY, 
 THREAT EMITTERS, SHOOT-BACK DEVICES AND OTHER RANGE AND TRAINING 
 AREA TECHNOLOGY. REMOTE ENGAGEMENT TARGET SYSTEM (RETS) 
 INSTALLATION IS AN EXAMPLE OF A RANGE UPGRADE. UPGRADES NORMALLY 
 EXCEED THE CAPABILITY OF THE BASE COMMANDER TO ACCOMPLISH WITHIN  
 HIS O&M BUDGET SO THEY COMPETE FOR FUNDING THROUGH THE BUDGETING  
 PROCESS. 
 C. MODERNIZATION/TRANSFORMATION. REFERS TO IMPROVING RANGES 
 AND TRAINING AREAS TO ACCOMPLISH TOMORROW'S TRAINING TOMORROW.  
 REQUIREMENTS FOR THIS TYPE OF INVESTMENT COME FROM CONCEPTUAL 
 PUBLICATIONS SUCH AS EXPEDITIONARY MANEUVER WARFARE (EMW), SHIP 
 TO OBJECTIVE MANEUVER (STOM) AND FROM THE FIELDING OF NEW WEAPON 
 SYSTEMS. CONCEPTS SUCH AS THIS, IF NOT PLANNED FOR, WILL BE 
 IMPLEMENTED WITH NO PREPARED TRAINING FACILITIES. IT IS ESSENTIAL 
 THAT FACILITIES BE PLANNED AND CONSTRUCTED TO PROVIDE 
 NECESSARY LOCATIONS FOR MARINES TO TRAIN. INVESTMENTS OF THIS 
 TYPE FALL PRINCIPALLY INTO THE MILITARY CONSTRUCTION (MILCON), AND 
 TO A LESSER DEGREE, PMC FUNDING CATEGORIES.  
 4. GRSP VITILIZATION. THE HIGHEST PRIORITY FOR GRSP IS ACCORDED 
 TO SUSTAINING EXISTING CAPABILITIES FOR CONTINUITY OF MARINE CORPS 
 TRAINING. THE NATURE OF THIS IS SUCH THAT REQUIREMENTS OFTEN 
 CANNOT BE FORESEEN AND WOULD NOT BE FUNDED IN A TIMELY MANNER IF 
 SUBJECTED TO THE CONSTRAINTS OF THE PROGRAM OBJECTIVE MEMORANDUM 
 (POM) BUDGET CYCLE. FUNDING OF SPECIFIC PROJECTS, USING O&M FUNDS 
 MANAGED AT THE INSTITUTIONAL LEVEL, IS THE INTENTION OF THE GRSP.  
 THE COST OF MATERIALS AND INSTALLATION FOR GRSP PROJECTS WILL NOT 
 NORMALLY EXCEED $200K. COMMANDING GENERAL, TECOM IS THE WAIVER 
 AUTHORITY FOR PROJECTS EXCEEDING THIS AMOUNT. 
 A. REQUIREMENTS AUTHORIZED UNDER THE GRSP WILL INCLUDE: 
 1) EXPANDING OR ALTERING THE CAPABILITIES OF EXISTING SYSTEMS. 
 2) UPGRADING EXISTING SYSTEM COMPONENTS. 
 3) SIMPLIFYING OPERATION AND/OR MAINTENANCE. 
 4) PROVIDING FOR PERSONNEL AND OPERATIONAL SAFETY AND SECURITY OF 
 INSTALLED GROUND RANGE SYSTEMS AND EQUIPMENT. 
 5) SUSTAINING AND REPLACING GROUND RANGE AND TRAINING AREA 
 CAPABILITIES. 
 B. THE FOLLOWING ARE SPECIFICALLY EXCLUDED FROM BEING 
 REPLACED/SUSTAINED WITH GRSP O&M, MC FUNDS: 
 1) FUNCTIONS EXCLUSIVELY FUNDED UNDER THE BASE OPERATING SUPPORT 
 (BOS) APPROPRIATION. EXAMPLES INCLUDE RANGE MAINTENANCE AND 
 EQUIPMENT OR SYSTEM REPAIRS/OVERHAUL. 
 2) BUILDING/FACILITY CONSTRUCTION PROJECTS EXCLUSIVELY FUNDED  
 UNDER THE MILITARY CONSTRUCTION (MILCON) APPROPRIATION. 
 3) SUPPORT EQUIPMENT (SE) SUCH AS EQUIPMENT APPEARING ON AN 
 ACTIVITY'S TABLE OF EQUIPMENT (T/E) LIST, EQUIPMENT ON ANY 
 COMPARABLE/CORRESPONDING ALLOWANCE LIST, SE USED FOR GENERAL PURPOSE 
 (NON-RANGE) MAINTENANCE SUCH AS VEHICLES, BOATS, AND LAWN MOWERS. 
 4) CONSUMABLE ITEMS ARE THE RESPONSIBILITY OF THE OPERATING 
 ACTIVITY. FOR EXAMPLE, BATTERIES AND TARGETS ARE NOT VALID GRSP 
 ITEMS AND SHOULD BE OBTAINED WITH ACTIVITY BOS FUNDS. 
 5) REPLENISHMENT OF SPARE OR REPAIR PARTS. 
 6) EXERCISE INSTRUMENTATION (E.G. MULTIPLE INTEGRATED LASER 
 ENGAGEMENT SYSTEM (MILES-2000), POSITION LOCATION INSTRUMENTATION 
 (PLI), INDOOR SIMULATED MARKSMANSHIP TRAINER (ISMT), AND THE 
 INFANTRY SQUAD TRAINER (IST)) 
 7) COMPUTER EQUIPMENT USED FOR ADMINISTRATIVE FUNCTIONS. 
 8) INSTALLATION OF SYSTEMS/EQUIPMENT NOT PROCURED UNDER THE GRSP 
 PROGRAM AND REINSTALLATION/RELOCATION OF PREVIOUSLY INSTALLED 
 SYSTEMS/EQUIPMENT. 
 5. GRSP CYCLE. GRSP WILL FUNCTION ON AN ANNUAL CYCLE AS OUTLINED 
 BELOW: 
 A. BEGINNING IN THE FALL OF EACH YEAR, THE BASES AND STATIONS WILL 
 GATHER POTENTIAL RANGE AND TRAINING AREA INVESTMENT PROJECTS THAT 
 WILL BE SUBMITTED INTO A DATABASE ACCESSIBLE VIA THE RANGE AND 
 TRAINING AREA MANAGEMENT DIVISION PAGE OF THE TECOM WEBSITE  
 (CURRENTLY UNDER DEVELOPMENT).  
 B. DURING THE PERIOD JANUARY TO MARCH EACH YEAR, A VISITATION TEAM 
 MADE UP OF OFFICIALS FROM TECOM, NSWC AND MARCORSYSCOM WILL VISIT 
 ALL THE BASES TO VALIDATE THE PROJECTS THAT WERE SUBMITTED VIA THE 
 WEBSITE. 
 C. DURING APRIL AND MAY, THE PROJECTS WILL BE RESEARCHED AND PRICED 
 OUT BASED ON ENGINEERING DATA COLLECTED BY THE VISITATION TEAM.  
 THE PRICED AND VALIDATED PROJECTS WILL THEN BE SUBMITTED TO THE  
 MARFORS FOR PRIORITIZATION.  
 D. DURING JUNE, MARFORS WILL PASS THEIR PRIORITIZED PROJECTS TO  
 TECOM FOR CONSOLIDATION AND FINAL USMC PRIORITIZATION. 
 E. IN JULY, A PRIORITIZATION BOARD MADE UP OF OFFICIALS REPRESENTING  
 THE ADVOCATES, TECOM, MARCORSYSCOM AND NSWC WILL MEET TO ESTABLISH  
 THE CONSOLIDATED PRIORITIZATION LIST. MARFORS WILL BE GIVEN THE 
 OPPORTUNITY TO BRIEF THEIR PROJECTS AS DESIRED. BASED ON THIS 
 PRIORITIZATION AND GIVEN THE FUNDING LEVEL AUTHORIZED FOR THAT 
 PARTICULAR YEAR, THE APPROVED PROJECTS WILL BE FUNDED. INITIALLY, 
 THE FUNDING CEILING FOR GRSP PROJECTS IS EXPECTED TO BE SET AT $200K 
 BUT MAY BE ADJUSTED BY CG TECOM GIVEN SUFFICIENT JUSTIFICATION.  
 PROJECTS THAT FALL BELOW THE CUT LINE WILL BE REVALIDATED DURING THE 
 FOLLOWING GRSP CYCLE. 
 F. THE PRIORITIZED LIST OF PROJECTS IS THEN SUBMITTED TO CG TECOM 
 FOR APPROVAL OF THE ACQUISITION PLAN. GUIDANCE WILL THEN BE 
 PROVIDED TO MARCORSYSCOM TO ACQUIRE THE NECESSARY MATERIALS TO 
 ACCOMPLISH THE PROJECT. THIS WILL TAKE PLACE IMMEDIATELY AFTER THE 
 PRIORITIZATION BOARD TO ENSURE THAT THE FUNDS ARE EXPENDED DURING 
 THE YEAR THEY ARE AUTHORIZED. ONCE COMPLETE, THE CYCLE BEGINS AGAIN 
 FOR THE FOLLOWING YEAR. 
 6. THE CYCLE OUTLINED ABOVE WILL BE MODIFIED FOR FY-03 BECAUSE OF 
 DELAYS IN THE PROGRAM START. BASES AND STATIONS WILL BE NOTIFIED BY 
 NAVAL MESSAGE AND ELECTRONIC MAIL OF THIS YEARS REQUIREMENTS.//