MARADMINS : 577/05
            
 R 052007Z DEC 05 
 FM CMC WASHINGTON DC(UC) 
 TO AL MARADMIN(UC) 
 UNCLASSIFIED// 
 MARADMIN 577/05 
 MSGID/GENADMIN/CMC WASHINGTON DC DCCDI/TFSD// 
 SUBJ/FYO6 ENLISTED GRADE STRUCTURE REVIEW (EGSR) UPDATED 
 /PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS// 
 REF/A/DOC/CMC MROC 21-2005/04JAN2005// 
 REF/B/DOC/CMC MPP-50/271200ZAPR2005// 
 REF/C/DOC/CMC MPP-50/23MAY2005// 
 REF/D/DOC/CMC MPP-50/271300ZAPR2005// 
 REF/E/DOC/CMC TFSD/081100ZAUG2005// 
 NARR/REF A IS MARINE REQUIREMENTS OVERSIGHT COUNCIL (MROC) DECISION 
 MEMORANDUM 21-2005. REF B IS MARADMIN 195/05, FYO6 ENLISTED GRADE  
 STRUCTURE REVIEW (EGSR). REF C IS LETTER OF INSTRUCTION AND PLAN OF 
 ACTION AND MILESTONES FOR THE FY06 ACTIVE DUTY AND RESERVE ENLISTED  
 GRADE STRUCTURE REVIEW. REF D IS MARADMIN 196/05, FY06 ENLISTED  
 GRADE STRUCTURE REVIEW (EGSR) PHASE I DETAILED PROCEDURES AND  
 ADMINISTRATIVE INSTRUCTIONS. REF E IS MARADMIN 360/05, FY06  
 ENLISTED GRADE STRUCTURE REVIEW (EGSR) PHASE II DETAILED PROCEDURES  
 AND ADMINISTRATIVE INSTRUCTIONS.// 
 POC/R.A. WEBB/GS-14/TECOM MCCDC/LOC:QUANTICO VA/TEL:DSN 278-3017 
 /TEL:CML 703-784-3017/EMAIL:RANDEL.WEBB@USMC.MIL// 
 POC/C.L. FITZGERALD/GS-14/MPP-50 MRA/LOC:QUANTICO VA/TEL:DSN 278-9368 
 /TEL:CML 703-784-9368/EMAIL:CHERYL.L.FITZGERALD@USMC.MIL// 
 POC/C.C. CHEEK/GS-14/TFSD MCCDC/LOC:QUANTICO VA/TEL:DSN 278-6086 
 /TEL:CML 703-784-6086/EMAIL:CYNTHIA.CHEEK@USMC.MIL// 
 POC/J.C. BARRY/CAPT/TFSD MCCDC/LOC:QUANTICO VA/TEL:DSN 278-6184 
 /TEL:CML 703-784-6184/EMAIL:BARRYJC@MCCDC.USMC.MIL// 
 GENTEXT/REMARKS/1. PURPOSE. THIS MESSAGE PROVIDES DETAILED 
 PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS FOR THE REMAINDER OF  
 PHASE II, AND OUTLINES THE PLAN OF ACTION AND MILESTONES FOR THE  
 REMAINDER OF THE FY06 EGSR. 
 2. BACKGROUND  
  A. REF A DIRECTED DC, M&RA AND DC, CD&I TO CONDUCT A 
 GRADE STRUCTURE REVIEW. REF B ANNOUNCED THE FY06 EGSR AND REF C  
 PROVIDED FURTHER DETAILS. REF D OUTLINED THE GOALS AND PROCEDURES 
 FOR PHASE I OF THE EGSR, WHILE REF E DID THE SAME FOR PHASE II.  
  B. PER THE REFS, THE FY06 EGSR WAS TO BE COMPRISED  
 OF THREE PHASES, TAKE APPROXIMATELY 16 MONTHS TO COMPLETE, AND SPAN 
 THREE PRODUCTION RUN CYCLES. PER REF C, THE OBJECTIVES OF PHASE II  
 WERE TO CLEANSE ALL MANPOWER REQUIREMENTS DATA (TO INCLUDE A REVIEW  
 OF THE ATTRIBUTION OF B-BILLETS TO PMOS) UTILIZING THE HUMAN  
 RESOURCE DEVELOPMENT PROCESS (HRDP) AND TOTAL FORCE STRUCTURE  
 MANAGEMENT SYSTEM (TFSMS) BUSINESS RULES AGREED UPON DURING PHASE I. 
 THE CLEANSED DATA WAS THEN TO BE UPLOADED INTO TFSMS PRIOR TO THE  
 FEB 2006 PRODUCTION RUN. 
  C. IN KEEPING WITH THE GOALS OUTLINED FOR PHASE II, THE EGSR 
 WORKING GROUP (WG) DECIDED TO ASSIST TRAINING AND EDUCATION 
 COMMAND (TECOM) IN THEIR EFFORTS TO STANDARDIZE AND TRANSFORM 
 MCO P1200.16, MILITARY OCCUPATIONAL SPECIALTIES MANUAL (MOS MANUAL) 
 INTO A DATA-BASED RESOURCE. THESE MODIFICATIONS TO THE MOS MANUAL  
 INCREASE THE ABILITY TO ACCURATELY CAPTURE MANPOWER REQUIREMENTS,  
 AND ENABLES AN ELECTRONIC INTERFACE BETWEEN THE NEW AUTOMATED CAREER  
 RETENTION SYSTEM AND THE MOS MANUAL. 
  D. ALTHOUGH THIS EFFORT EXTENDS THE WORKING TIMELINE OF THE EGSR 
 BY SIX MONTHS, ALL EGSR PRODUCTS WILL BE IN PLACE IN TIME TO AFFECT 
 FY08 STRUCTURE AS ORIGINALLY PLANNED, AND THE END PRODUCT WILL BE  
 IMPROVED BECAUSE USERS WILL BE SHAPING THE MOST ACCURATE STRUCTURAL  
 REQUIREMENTS POSSIBLE. 
 3. PROCEDURES AND INSTRUCTIONS. 
  A. PHASE II CONTINUES TO TAKE PLACE THROUGH 28 FEB 06, THE FOCUS 
 OF EFFORT IS THE PURGING OF THE MOS MANUAL. 
  B. AN MOS MANUAL WG WAS FORMED WITH MEMBERS OF TOTAL FORCE  
 STRUCTURE DIVISION (TFSD), RA, MPP-50, MMEA, MMOA, MI, AND TECOM.  
 ITS GOAL WAS TO FIND THE MOST EFFICIENT AND EFFECTIVE WAY TO  
 STANDARDIZE THE MOS MANUAL IN ORDER TO MOST ACCURATELY CAPTURE  
 MANPOWER REQUIREMENTS, AND AFFECT THE ELECTRONIC INTERFACE BETWEEN  
 IT AND THE NEW AUTOMATED CAREER RETENTION SYSTEM. AS OF 31 OCT 05,  
 THE WG HAS CONCEIVED NEW CATEGORIES AND TYPES OF MOS'S, AND HAS RE- 
 DISTRIBUTED ALL CATEGORY B, SPECIAL EDUCATION PROGRAM, AND  
 IDENTIFYING AND REPORTING MOS'S INTO THESE NEW TYPES AND CATEGORIES. 
 THE WG HAS ALSO EARMARKED ALL MOS'S WITHOUT ASSOCIATED STRUCTURE FOR 
 DELETION. 
  C. THE WG IS CURRENTLY STAFFING ITS RESULTS VIA MCATS AND EMAIL  
 TO ALL THE ADVOCATES AND OCCUPATIONAL FIELD SPONSORS FOR CONCURRENCE  
 BEFORE IMPLEMENTING THE CHANGES WITHIN THE TOTAL FORCE STRUCTURE  
 MANAGMENT SYSTEM (TFSMS), MOS MANUAL, AND THE MARINE CORPS TOTAL  
 FORCE SYSTEM (MCTFS). CONCURRENCE / NON-CONCURRENCE SHOULD BE  
 TRANSMITTED TO TECOM POC MR RANDEL WEBB BY 02 DECEMBER 05. 
  D. DUE TO THE MOS MANUAL PURGING EFFORT, CONCLUSION OF THE EGSR  
 WILL NOW BE THE FEB 07 PRODUCTION RUN VICE THE AUG 06 PRODUCTION  
 RUN. THE NEW TIMELINE IS AS FOLLOWS: PHASE II MISSION COMPLETE BY  
 FEB 06 PRODUCTION RUN, PHASE III DATA CLEANSING MISSION COMPLETE BY  
 AUG 06 PRODUCTION RUN, AND PHASE IV GRADE SHAPING MISSION COMPLETE  
 BY FEB 07 PRODUCTION RUN.//