FY06 ENLISTED GRADE STRUCTURE REVIEW (EGSR) UPDATED PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS
Date Signed: 12/5/2005 | MARADMINS Number: 577/05
MARADMINS : 577/05

R 052007Z DEC 05
FM CMC WASHINGTON DC(UC)
TO AL MARADMIN(UC)
UNCLASSIFIED//
MARADMIN 577/05
MSGID/GENADMIN/CMC WASHINGTON DC DCCDI/TFSD//
SUBJ/FYO6 ENLISTED GRADE STRUCTURE REVIEW (EGSR) UPDATED
/PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS//
REF/A/DOC/CMC MROC 21-2005/04JAN2005//
REF/B/DOC/CMC MPP-50/271200ZAPR2005//
REF/C/DOC/CMC MPP-50/23MAY2005//
REF/D/DOC/CMC MPP-50/271300ZAPR2005//
REF/E/DOC/CMC TFSD/081100ZAUG2005//
NARR/REF A IS MARINE REQUIREMENTS OVERSIGHT COUNCIL (MROC) DECISION
MEMORANDUM 21-2005. REF B IS MARADMIN 195/05, FYO6 ENLISTED GRADE
STRUCTURE REVIEW (EGSR). REF C IS LETTER OF INSTRUCTION AND PLAN OF
ACTION AND MILESTONES FOR THE FY06 ACTIVE DUTY AND RESERVE ENLISTED
GRADE STRUCTURE REVIEW. REF D IS MARADMIN 196/05, FY06 ENLISTED
GRADE STRUCTURE REVIEW (EGSR) PHASE I DETAILED PROCEDURES AND
ADMINISTRATIVE INSTRUCTIONS. REF E IS MARADMIN 360/05, FY06
ENLISTED GRADE STRUCTURE REVIEW (EGSR) PHASE II DETAILED PROCEDURES
AND ADMINISTRATIVE INSTRUCTIONS.//
POC/R.A. WEBB/GS-14/TECOM MCCDC/LOC:QUANTICO VA/TEL:DSN 278-3017
/TEL:CML 703-784-3017/EMAIL:RANDEL.WEBB@USMC.MIL//
POC/C.L. FITZGERALD/GS-14/MPP-50 MRA/LOC:QUANTICO VA/TEL:DSN 278-9368
/TEL:CML 703-784-9368/EMAIL:CHERYL.L.FITZGERALD@USMC.MIL//
POC/C.C. CHEEK/GS-14/TFSD MCCDC/LOC:QUANTICO VA/TEL:DSN 278-6086
/TEL:CML 703-784-6086/EMAIL:CYNTHIA.CHEEK@USMC.MIL//
POC/J.C. BARRY/CAPT/TFSD MCCDC/LOC:QUANTICO VA/TEL:DSN 278-6184
/TEL:CML 703-784-6184/EMAIL:BARRYJC@MCCDC.USMC.MIL//
GENTEXT/REMARKS/1. PURPOSE. THIS MESSAGE PROVIDES DETAILED
PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS FOR THE REMAINDER OF
PHASE II, AND OUTLINES THE PLAN OF ACTION AND MILESTONES FOR THE
REMAINDER OF THE FY06 EGSR.
2. BACKGROUND
A. REF A DIRECTED DC, M&RA AND DC, CD&I TO CONDUCT A
GRADE STRUCTURE REVIEW. REF B ANNOUNCED THE FY06 EGSR AND REF C
PROVIDED FURTHER DETAILS. REF D OUTLINED THE GOALS AND PROCEDURES
FOR PHASE I OF THE EGSR, WHILE REF E DID THE SAME FOR PHASE II.
B. PER THE REFS, THE FY06 EGSR WAS TO BE COMPRISED
OF THREE PHASES, TAKE APPROXIMATELY 16 MONTHS TO COMPLETE, AND SPAN
THREE PRODUCTION RUN CYCLES. PER REF C, THE OBJECTIVES OF PHASE II
WERE TO CLEANSE ALL MANPOWER REQUIREMENTS DATA (TO INCLUDE A REVIEW
OF THE ATTRIBUTION OF B-BILLETS TO PMOS) UTILIZING THE HUMAN
RESOURCE DEVELOPMENT PROCESS (HRDP) AND TOTAL FORCE STRUCTURE
MANAGEMENT SYSTEM (TFSMS) BUSINESS RULES AGREED UPON DURING PHASE I.
THE CLEANSED DATA WAS THEN TO BE UPLOADED INTO TFSMS PRIOR TO THE
FEB 2006 PRODUCTION RUN.
C. IN KEEPING WITH THE GOALS OUTLINED FOR PHASE II, THE EGSR
WORKING GROUP (WG) DECIDED TO ASSIST TRAINING AND EDUCATION
COMMAND (TECOM) IN THEIR EFFORTS TO STANDARDIZE AND TRANSFORM
MCO P1200.16, MILITARY OCCUPATIONAL SPECIALTIES MANUAL (MOS MANUAL)
INTO A DATA-BASED RESOURCE. THESE MODIFICATIONS TO THE MOS MANUAL
INCREASE THE ABILITY TO ACCURATELY CAPTURE MANPOWER REQUIREMENTS,
AND ENABLES AN ELECTRONIC INTERFACE BETWEEN THE NEW AUTOMATED CAREER
RETENTION SYSTEM AND THE MOS MANUAL.
D. ALTHOUGH THIS EFFORT EXTENDS THE WORKING TIMELINE OF THE EGSR
BY SIX MONTHS, ALL EGSR PRODUCTS WILL BE IN PLACE IN TIME TO AFFECT
FY08 STRUCTURE AS ORIGINALLY PLANNED, AND THE END PRODUCT WILL BE
IMPROVED BECAUSE USERS WILL BE SHAPING THE MOST ACCURATE STRUCTURAL
REQUIREMENTS POSSIBLE.
3. PROCEDURES AND INSTRUCTIONS.
A. PHASE II CONTINUES TO TAKE PLACE THROUGH 28 FEB 06, THE FOCUS
OF EFFORT IS THE PURGING OF THE MOS MANUAL.
B. AN MOS MANUAL WG WAS FORMED WITH MEMBERS OF TOTAL FORCE
STRUCTURE DIVISION (TFSD), RA, MPP-50, MMEA, MMOA, MI, AND TECOM.
ITS GOAL WAS TO FIND THE MOST EFFICIENT AND EFFECTIVE WAY TO
STANDARDIZE THE MOS MANUAL IN ORDER TO MOST ACCURATELY CAPTURE
MANPOWER REQUIREMENTS, AND AFFECT THE ELECTRONIC INTERFACE BETWEEN
IT AND THE NEW AUTOMATED CAREER RETENTION SYSTEM. AS OF 31 OCT 05,
THE WG HAS CONCEIVED NEW CATEGORIES AND TYPES OF MOS'S, AND HAS RE-
DISTRIBUTED ALL CATEGORY B, SPECIAL EDUCATION PROGRAM, AND
IDENTIFYING AND REPORTING MOS'S INTO THESE NEW TYPES AND CATEGORIES.
THE WG HAS ALSO EARMARKED ALL MOS'S WITHOUT ASSOCIATED STRUCTURE FOR
DELETION.
C. THE WG IS CURRENTLY STAFFING ITS RESULTS VIA MCATS AND EMAIL
TO ALL THE ADVOCATES AND OCCUPATIONAL FIELD SPONSORS FOR CONCURRENCE
BEFORE IMPLEMENTING THE CHANGES WITHIN THE TOTAL FORCE STRUCTURE
MANAGMENT SYSTEM (TFSMS), MOS MANUAL, AND THE MARINE CORPS TOTAL
FORCE SYSTEM (MCTFS). CONCURRENCE / NON-CONCURRENCE SHOULD BE
TRANSMITTED TO TECOM POC MR RANDEL WEBB BY 02 DECEMBER 05.
D. DUE TO THE MOS MANUAL PURGING EFFORT, CONCLUSION OF THE EGSR
WILL NOW BE THE FEB 07 PRODUCTION RUN VICE THE AUG 06 PRODUCTION
RUN. THE NEW TIMELINE IS AS FOLLOWS: PHASE II MISSION COMPLETE BY
FEB 06 PRODUCTION RUN, PHASE III DATA CLEANSING MISSION COMPLETE BY
AUG 06 PRODUCTION RUN, AND PHASE IV GRADE SHAPING MISSION COMPLETE
BY FEB 07 PRODUCTION RUN.//