MARADMINS : 360/05
R 081100Z AUG 05
FM CMC WASHINGTON DC(UC)
UNCLASSIFIED//
MARADMIN 360/05
MSGID/GENADMIN/CMC WASHINGTON DC DCCD/TFSD//
SUBJ/FY06 ENLISTED GRADE STRUCTURE REVIEW (EGSR) PHASE II DETAILED
/PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS//
REF/A/DOC/CMC MROC 21-2005/01JAN2005//
REF/B/DOC/CMC MPP-50/271200Z2APR2005//
REF/C/DOC/CMC MPP-50/23MAY2005//
REF/D/DOC/CMC MPP-50/271300ZAPR2005//
NARR/REF A IS MARINE REQUIREMENTS OVERSIGHT COUNCIL (MROC) DECISION
MEMORANDUM 21-2005. REF B IS MARADMIN 195/05, FY06 ENLISTED GRADE
STRUCTURE REVIEW (EGSR). REF C IS LETTER OF INSTRUCTION AND PLAN OF
ACTION AND MILESTONES FOR THE FY06 ACTIVE DUTY AND RESERVE ENLISTED
GRADE STRUCTURE REVIEW. REF D IS MARADMIN 196/05, FY06 ENLISTED
GRADE STRUCTURE REVIEW (EGSR) PHASE I DETAILED PROCEDURES AND
ADMINISTRATIVE INSTRUCTIONS.//
POC/C.C. CHEEK/GS-14/TFSD MCCDC/LOC:QUANTICO VA/TEL:DSN 278-6086
/TEL:COML 703-784-6086/EMAIL:CYNTHIA.CHEEK@USMC.MIL//
POC/J.C. BARRY/CAPT/TFSD MCCDC/LOC:QUANTICO VA/TEL:DSN 278-6184
/TEL:COML 703-784-6184/EMAIL:BARRYJC@MCCDC.USMC.MIL//
GENTEXT/REMARKS/1. PURPOSE. THIS MESSAGE PROVIDES DETAILED
PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS FOR PHASE II OF THE FY06
EGSR.
2. BACKGROUND. REF A DIRECTED DC, M&RA AND DC, CD TO CONDUCT A
GRADE STRUCTURE REVIEW. REF B ANNOUNCES THE FY06 EGSR AND REF C
PROVIDES FURTHER DETAILS. THE FY06 EGSR IS COMPRISED OF THREE PHASES
THAT WILL TAKE APPROXIMATELY 16 MONTHS TO COMPLETE AND WILL SPAN
THREE TROOPLIST CYCLES. PER THE REFS, WHAT FOLLOWS ARE THE DETAILED
PROCEDURES AND ADMINISTRATIVE INSTRUCTIONS FOR PHASE II OF THE FY06
EGSR.
3. PROCEDURES AND INSTRUCTIONS.
A. PHASE II WILL TAKE PLACE 01 SEP 05 THROUGH 28 FEB 06. PER REF
C, THE OBJECTIVES OF PHASE II ARE TO CLEANSE ALL MANPOWER
REQUIREMENTS DATA (TO INCLUDE A REVIEW OF THE ATTRIBUTION OF
B-BILLETS TO PMOS) UTILIZING THE HUMAN RESOURCE DEVELOPMENT PROCESS
(HRDP) AND TOTAL FORCE STRUCTURE MANAGEMENT SYSTEM (TFSMS) BUSINESS
RULES AGREED UPON DURING PHASE I, AND TO UPLOAD THE CLEANSED DATA
INTO TFSMS PRIOR TO THE FEB 2006 UPDATE OF THE TROOPLIST.
B. THE TFSMS TABLE OF ORGANIZATION/EQUIPMENT CHANGE REQUEST
(TOECR) MODULE WILL BE THE TOOL UTILIZED TO CLEANSE THE MANPOWER
REQUIREMENTS DATA.
C. EACH MOS SPECIALIST AND OCCFLD SPONSOR WILL BE AFFORDED THE
OPPORTUNITY TO RECEIVE TOECR MODULE TRAINING IN ACCORDANCE WITH THE
FOLLOWING DETAILS:
(1) SCHEDULED DATES: 7-9 AND 12 SEP 05 FROM 0800-1600.
(2) LOCATION: CONF RM 251, JAMES WESLEY MARSH CENTER, 3280
RUSSELL RD, QUANTICO, VA, 22134.
(3) THERE WILL BE 20 TRAINEE SEATS AVAILABLE PER DAY. A SIGN
UP ROSTER IS POSTED ON THE MPP-50 WEBSITE:
HTTPS:/WWW.MANPOWER.USMC.MIL/
PORTAL/PAGE?_PAGEID=278,1950783&_DAD=PORTAL&_SCHEMA=PORTAL
(4) UNIFORM: UTILITIES.
(5) ANY MOS SPECIALIST OR OCCFLD SPONSOR THAT WILL NOT BE ABLE
TO ATTEND IS REQUESTED TO CONTACT THE POC.
D. DC, M&RA AND DC, CD WILL SPONSOR AN EGSR PHASE II KICK-OFF
MEETING 16 SEP 05 FROM 0800-1200 IN CONF ROOMS 253-256, JAMES WESLEY
MARSH CENTER, 3280 RUSSELL RD, QUANTICO, VA.
(1) IT IS IMPERATIVE THAT ALL MOS SPECIALISTS AND OCCFLD
SPONSORS ATTEND THIS MEETING.
(2) UNIFORM FOR THE MEETING IS UTILITIES.
(3) ALL MOS SPECIALISTS/OCCFLD SPONSORS WHO WILL NOT BE
ABLE TO ATTEND ARE REQUESTED TO CONTACT GS-14 CHERYL FITZGERALD, DSN
278-9370, COML (703)784-9370 FOR INFORMATION AND FURTHER INSTRUCTIONS.//